This number is cited to a source document, and its arithmetic re-adds to the dollar (it cross-foots, or it is counted inside a total that does).
No fund total in Schedule 2; this is the sum of its two rows. Schedule 5 (p. 92) prints the Capital Projects fund subtotal as $2,700,000.
| Line | Amount | Status |
|---|---|---|
| Building Capital Projects | $750,000 | ✓ Sourced |
| Road Dept Bridge Projects | $1,950,000 | ✓ Sourced |